Sunday, May 12, 2019

Estimating and Production Decision Making Essay

Estimating and Production Decision Making - Essay ExampleTo get that siding, we multiply the mean output per operative week with the size of the rout and efficiency of that crowd.For example For Gang no 1 tight output per operative week is 0.16, by multiplying this with the size of the gang say 6 and the efficiency of the gang (100%) we get the output per week as 0.16 X 6 X 100% = 0.96. We hasten mensural the size of the other gangs in the similar way, (assuming output per week of each gang nearer to 0.96, because we have rig that cost efficiency is maximum for gang size of 6). The size of the gang thus found is given in reddened color.... The size of the gang thus found is given in red color.Gang Number 1 2 3 4 5 6 7 8 9 10 Mean output per operative week 0.16 0.21 0.16 0.16 0.12 0.12 0.26 0.16 0.11 0.16 Cost per operative week 320 320 335 three hundred 320 320 335 320 315 315 Overheads per Gang week 210 210 215 200 210 210 215 210 205 205 Size of the gang65661111461262. Sta rting of work of any particular gangWe have ensured that the preceding gang has realized more than one unit in the week earlier to the week we have started the new gang.3. We have also ensured that after starting a gang, the preceding acitivity is completed at any stage.Working calculations are in excel

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.